January, 17 2002Archeops was flying ... |
Successful launch at 11:31 UT
06:30 PM Due to a balloon
problem,
the flight must be interrupted. The recovery will be done tomorrow by
helicopter.
The instrument worked perfectly, with very clean signal at 34.5 km.
Online trajectory |
Predicted trajectory |
Ephemerids |
Anticipated sky coverage |
D day - morning |
On the launchpad |
The launch |
After the launch |
11:10 AM The gondola is ready
for
take-off, correctly positionned on the launchpad.
The pivot is connected to the flight chain. Last prepation of the
balloon.
11:40 AM Ballon filling started: so far, so good ...
12:31 AM Archeops launch
has
been sucessful.
Experiment is working fine and expecting ceiling time within 3 hours.
02:19 PM Valve gate is open, photons are collected !
03:30 PM
0.1K
stage at 97 mK